Marblehead Coastal

Boudreau Pipeline | Pipeline | Southern California | Water
Boudreau Pipeline | Pipeline | Southern California | Water
Boudreau Pipeline | Pipeline | Southern California | Water
Boudreau Pipeline | Pipeline | Southern California | Wet Utilities
Marblehead Coastal 1.jpg
Marblehead Coastal 2.jpg
Marblehead Coastal 3.jpg
Marblehead Coastal 4.jpg
Marblehead Coastal 12-44-23_734.jpg
Marblehead Coastal 14-44-30_138.jpg
Boudreau Pipeline | Pipeline | Southern California | Water
Boudreau Pipeline | Pipeline | Southern California | Water
Boudreau Pipeline | Pipeline | Southern California | Water
Boudreau Pipeline | Pipeline | Southern California | Wet Utilities
Marblehead Coastal 1.jpg
Marblehead Coastal 2.jpg
Marblehead Coastal 3.jpg
Marblehead Coastal 4.jpg
Marblehead Coastal 12-44-23_734.jpg
Marblehead Coastal 14-44-30_138.jpg

Marblehead Coastal

$0.00

Project Location:
San Clemente, CA

Client:
SunCal Companies

Contract:

$11,670,000

Add To Cart

This project in the coastal zone required close coordination with environmental agencies. The plan included construction of a storm drain system, including a five-acre stormwater holding vault, and CDS units, metering stations, pumps, wet wells and required electrical.