Northridge Middle School Utility Investigation

Boudreau Pipeline | Pipeline | Southern California | Gas | SUE
Boudreau Pipeline | Pipeline | Southern California | Gas | SUE
Boudreau Pipeline | Pipeline | Southern California | Gas | SUE
Boudreau Pipeline | Pipeline | Southern California | Gas | SUE
Boudreau Pipeline | Pipeline | Southern California | Gas | SUE
Boudreau Pipeline | Pipeline | Southern California | Gas | SUE
Boudreau Pipeline | Pipeline | Southern California | Gas | SUE
Boudreau Pipeline | Pipeline | Southern California | Gas | SUE

Northridge Middle School Utility Investigation

$0.00

Project Location:
Northridge, CA

Client:
JMC-2

Contract:

$41,000

Add To Cart

Boudreau Pipeline's SUE division was able to perform electronic and ground penetrating radar detection during the day to confirm pothole locations. Working around the school schedule and class sessions, the actual pothole work was done at night to verify depth and alignment of over 40 underground utilities. No tracing wires on onsite gas, and water pipelines and hard clay soil conditions were the challenges encountered and overcome by our talented Utility Locating Crew.